Bari Bari
East London
Complete ventilation system for Bari Bari
What was needed?
All Ventilation & Extraction Ltd worked alongside the customer who had had many failed attempts at trying to get planning permission to install a commercial kitchen ventilation system in his South Korean restaurant.
What we provided
The canopy was already there so we just needed to add the ductwork, odour control and fans.
The extracted air is powered by a 560/4 GBD Helios Gigabbox Fan and the intake by a 450dia S & P short cased axial fan.
All drawings and specifications were done and handed over to the local planning authority who passed the proposed system.
Odour & Noise Control
2 Stage Carbon filter unit complete with 2 of G4 Panel filters & 5 Site safe carbon filters to eradicate smells produced from cooking.
900mm attenuator on extract, flexible connections to both sides of extract and intake fans to reduce any vibration passing onto the ducting.
Ductwork had to rise to the top of the building so we matched the ducting colour with the real colour of the building.
- Mechanical extract and fresh air
- Gas interlock system
- Powder coated ductwork
- Scaffolding
- 2 Stage Carbon filter unit
- Attenuators
Not sure which solution fits your business needs?
Give us a call, we’d love to hear from you.